Commercial overview

How to inspect semi-trailers before shipment

Inspection should verify the approved order file and record exceptions before the trailer is released for export.

Approve the inspection baseline

Use the signed specification, approved drawings, component list, finish, markings and documented change history. An inspector cannot resolve a commercial ambiguity that was never fixed in writing.

Verify identity and components

Record chassis or project identification, main assemblies, axles, suspension, braking equipment, tyres, hydraulic and electrical items against the approved file. Accepted substitutions must be traceable.

Check fabrication and function

Review visible fabrication, key dimensions, deck or loading functions, lights, brakes, hydraulics where applicable, finish and safety labels. Test scope depends on the model and written inspection plan.

Build the release file

Keep dated photos, exception records, corrective-action evidence, packing or loading information and final documents. Shipment release should identify remaining open items instead of treating silence as acceptance.

FAQ

Frequently asked questions

Does inspection replace local certification?

No. Inspection verifies the agreed product scope; destination approval remains a separate responsibility.

Can the buyer receive photo records?

Photo follow-up and pre-shipment records can be coordinated within the agreed inspection scope.

B2B inquiry

Send specifications or an inquiry

Complete the information you have. Missing technical points will be reviewed before an offer is prepared.

B2B inquiry

Send your technical task, drawing or required characteristics

Include destination, trailer type, quantity, cargo and configuration so the factory proposal reflects the real operation.